Method for producing metalized fibrous composite sheet with olefin coating

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8778462
APP PUB NO 20130122316A1
SERIAL NO

13293203

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite sheet comprises a substrate and a multi-layer coating on its outer surface, the coating comprising a metal layer and an outer polymeric layer formed from a precursor comprising a polymerizable composition that includes an olefin group and a moisture curable group, such as an isocyanate or silane group. The function of the polymeric layer includes protecting the metal layer from corrosion. A production process for the composite sheet includes depositing the precursor and exposing it to both beam radiation and moisture, which respectively promote polymerization and curing at different sites of the precursor. The amenability of the isocyanate or silane functionality to moisture-promoted coupling promotes substantially full conversion and curing of the precursor, even of portions of the substrate that are geometrically shadowed from incident beam radiation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DUPONT SAFETY & CONSTRUCTION INC974 CENTRE ROAD WILMINGTON DE 19805

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brabbs, Noel Stephen Garnich, LU 24 114
Huebsch, Eric Contern, LU 19 43
Tao, Yufei Hockessin, US 3 3
Wilczek, Lech Wilmington, US 59 455

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 15, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00