Tubular combustion chamber system and gas turbine unit having a tubular combustion chamber system of this type

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11852344
SERIAL NO

17440354

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tubular combustion chamber system for a gas turbine unit includes a plurality of annularly arranged transition lines, which are designed to be connected at the upstream ends thereof to respective burners and to conduct hot gas produced by the burners to a turbine. The tubular combustion chamber system has a hot gas distributor, which is designed to be connected to the turbine and defines a ring channel, which is open to the turbine and into which the downstream ends of the transition lines lead. A gas turbine unit includes a plurality of annularly arranged burners, a turbine and a tubular combustion chamber system which connects the burners to the turbine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY GLOBAL GMBH & CO KG81739 MÜNCHEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gralki, Matthias Mulheim an der Ruhr, DE 7 3
Krusch, Claus Essen, DE 20 29
Schmidt, Daniel Mülheim an der Ruhr, DE 111 1051

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00